Our Recent Projects

21 Mile, 200 barrel/min Water Transfer System

Full EPC services for a fully automated 10,000 horsepower frac-water transportation system, capable of bi-directionally sending 200 BPM between multiple pits and frac locations.

24 Miles of Oil, Gas and Residue pipelines

Full EPC services for 24 miles of gathering system upgrades and tie-ins in South Texas, including steel, flex pipe and poly-based materials.

26 Mile Oil Gathering System, Permian Basin

This large-diameter steel system was engineered, constructed, and commissioned for use in under 120 days.