26 mile Oil Gathering System, Permian Basin.

This system is due for completion in December 2023, and is providing the full Turn-Key Engineering, Procurement and Construction services to design and build the pipeline network for a client in West Texas.  The system will be DOT compliant and facilitate the tie-ins of two major oil distribution and sale systems close to Midland.  Completely customized and engineered for the specific deliverables to meet the needs of our client, they will see less downtime, increased reliability, reduced operating costs, and lower emission rates. The pipeline and all supporting engineered equipment supports 100,000 Barrels/Day of oil through 16” steel piping.