21 Mile, Dual HDPE Lines, Bi-Directional Water Transfer System, Permian Basin.

We are delivering value do a client by providing “concept-to-commissioning” services for a mission critical water transfer pipeline in the Permian Basin, which is a 21-mile-long recycled water transfer pipeline supporting fracking operations.  Utilizing more the 9,000 horsepower of pumps and motors the pipeline will have the capacity to support two simultaneous frac crews in different locations on the property, operated from 7 fully automated hub locations, made up of 3 origination points and 4 booster stations, along its length.  Significant savings will be seen monthly by minimizing diesel consumption and emissions in addition to lessening environmental concerns by using traditional lay-flat hose. Volumetric capacity is 288,000 Barrel/Day of water.