Brownfield Engineering Projects
Project Title
Scope Type
TEG system evaluation
Produced water tank evaluation
Jatco Blowcase evaluation
G3616 Cat Engine Turbocharger Evaluation
Mist Cooler Evaluation
NMED - Closed Vent System Certification WTG
Inlet Control Valve Addition - Design Basis
Inlet Control Valve Addition - CV Spec/Narrative Review
Inlet Control Valve Addition - Final Pre-FEED Deliverables
TCEQ - Closed Vent System Certification King George
TEG Reboiler Overpressure Assessment
TEG Filter Coalescer Addition
Standard SOW and Bid Tab for top end overhauls
Parker LACT Cavitation Review
Water Content Study
NMED - Closed Vent System Certification Nailed It B
Pecos Plant expansion data evaluation
LP Separator Tie-In Review
Compressor Valve Recession Maint. Observation
Evaluation of PRV lifting sites
Pecos Plant Stabilizer Design Basis Study
Parker Hydraulic Study
East Pakse NPSH Study
NMED - Closed Vent System Certification Cypress 33
Compressor Station Walk Down for EPA 0000b
Crude Overpressure Protection Study
Pakse Modifications Study
Thrust Bearing Phase A Letter
Compressor Station Support and modeling
As-Builts
Update P&ID